10CrMo9-10 — EN number 1.7380, the 2.25% chromium, 1% molybdenum grade — is the next step up from 13CrMo4-5 in the creep-resisting family. Where the 1.25Cr steel runs out at about 550 °C, 2.25Cr-1Mo carries main steam piping, headers and hydrogen-bearing process lines into the 550–580 °C band, and it does so with better resistance to hydrogen attack, which is why refining and ammonia service reach for it. It is supplied normalized and welded with preheat and post-weld heat treatment; the PWHT temperature matters more here than on 13CrMo4-5 because the alloy is more sensitive to over-tempering. We supply OD 10 to 600 mm, wall 1 to 80 mm, in TC1 or TC2, with elevated-temperature proof strength on the certificate.
Where it sits in the creep ladder
Table 1 — Selecting by design metal temperature
| Design temperature | Grade | Why |
|---|---|---|
| Up to 400 °C | P265GH | No alloy premium justified |
| 400 – 480 °C | 16Mo3 | 0.3% Mo lifts creep strength cheaply |
| 480 – 550 °C | 13CrMo4-5 | 1.25Cr-0.5Mo, the standard superheater grade |
| 550 – 580 °C | 10CrMo9-10 | 2.25Cr-1Mo; higher creep rupture strength at the same wall |
| Above 580 °C | T91 / P91 | 9Cr martensitic; the ferritic grades no longer hold |
The other reason to choose 2.25Cr-1Mo is hydrogen. Above about 450 °C and at hydrogen partial pressure, carbon steel and even 1.25Cr suffer hydrogen attack; the Nelson curves place 2.25Cr-1Mo in a much safer band, which is why hydrotreaters and ammonia plants are built from it.
Chemical composition
Table 2 — 10CrMo9-10 / 1.7380 chemistry, cast analysis (%)
| Element | Requirement | Element | Requirement |
|---|---|---|---|
| C | 0.08 – 0.14 | P | 0.020 max |
| Si | 0.50 max | S | 0.010 max |
| Mn | 0.40 – 0.80 | Cr | 2.00 – 2.50 |
| Mo | 0.90 – 1.10 | — | — |
Carbon is capped at 0.14% — lower than 13CrMo4-5 — because at 2.25% chromium a higher carbon content promotes carbide coarsening and embrittlement in thick sections. Sulphur at 0.010% is mandatory for weldability.
Mechanical properties
Table 3 — Tensile and yield by wall thickness, normalized
| Wall thickness | Tensile Rm | Yield ReH min |
|---|---|---|
| Up to 16 mm | 480 – 630 MPa | 310 MPa |
| Over 16 – 40 mm | 480 – 630 MPa | 300 MPa |
| Over 40 – 60 mm | 480 – 630 MPa | 290 MPa |
| Over 60 – 100 mm | 470 – 620 MPa | 280 MPa |
| Over 100 – 150 mm | 460 – 610 MPa | 260 MPa |
| Over 150 – 250 mm | 450 – 600 MPa | 250 MPa |
Welding and heat treatment
Table 4 — Thermal practice
| Item | Value | Note |
|---|---|---|
| Normalizing (+N) | 900 – 960 °C, air cool | Standard delivery condition |
| Preheat before welding | 200 – 300 °C | Higher than for 1.25Cr; the hardenability is greater again |
| Interpass temperature | 300 °C maximum | Excess heat input coarsens the HAZ |
| Post-weld heat treatment | 690 – 750 °C | Hold 1 h per 25 mm; do not exceed 750 °C |
| Filler metal | 2.25Cr-1Mo matching (e.g. ER90S-B3 / E9018-B3) | Carbon or 1.25Cr filler is not correct |
| Hardness after PWHT | 250 HV10 maximum in the HAZ | Confirm on the procedure qualification |
The one failure mode to watch: PWHT above 750 °C. It looks like being thorough, but it over-tempers the steel and the creep rupture life drops without any visible change. The fabricator’s procedure should state the ceiling, not just the target.
Standards and equivalents
Table 5 — Cross-reference
| System | Designation | Product form |
|---|---|---|
| EN | EN 10216-2 — 10CrMo9-10 / 1.7380 | Seamless tube |
| ASTM | A335 P22 | Seamless pipe |
| ASTM | A213 T22 | Boiler and heat exchanger tube |
| ASTM | A387 Gr.22 | Plate |
| JIS | STPA24 / STBA24 | Pipe / tube |
| GB | GB 5310 10CrMo910 | Boiler tube |
| DIN | DIN 17175 10CrMo910 | Withdrawn predecessor |
Where 10CrMo9-10 is used
Main steam piping
Subcritical and supercritical main steam and hot reheat lines in the 550–580 °C band, where 1.25Cr has run out of creep strength.
Boiler headers
Header bodies and stubs at the top of the superheater, where the metal temperature is highest and the wall is thickest.
Hydrotreaters and hydrocrackers
Hydrogen-bearing process lines and reactor internals, where the Nelson curves exclude lower-chrome steels.
Ammonia synthesis
High pressure synthesis loops, where 2.25Cr-1Mo is the established material for hydrogen and nitrogen service.
High pressure heat exchangers
Tube and shell in hydrogen service, where the tubes and tube sheet must both resist hydrogen attack.
Coal gasification
Hot high pressure syngas lines, one of the few duties where even 2.25Cr is pushed to its limit.
Frequently asked questions
Is 10CrMo9-10 the same as A335 P22?
Same alloy family and normally accepted as alternatives after review. The chemistry windows, tolerances and test schedules differ, and the certificate has to be re-issued against whichever standard the drawing cites.
What is the maximum service temperature?
About 580 °C, with the exact limit set by the allowable stress in the design code. Above that a 9Cr steel is required — the ferritic grades lose creep strength faster than the wall can compensate.
Why is PWHT so critical on this grade?
Because 2.25Cr-1Mo is more sensitive to tempering than 1.25Cr. Too low and the HAZ stays hard and crack-prone; too high and the creep rupture life is reduced with no visible change. The window is 690–750 °C and it should be controlled, not approximated.
Can it be used in hydrogen service?
Yes, and that is one of its main advantages. The Nelson curves allow 2.25Cr-1Mo at hydrogen partial pressures and temperatures where carbon steel and 1.25Cr would suffer hydrogen attack. Confirm against the current curve for your conditions.
Is it supplied normalized or quenched and tempered?
Normalized as standard for tube. Quenched and tempered plate is available for heavier sections; for tube the normalized condition is the norm and what the mechanical table assumes.
Does it need impact testing?
Per test category — TC1 or TC2 both require impact. State the test temperature if it is below ambient; the base grade is normally tested at room temperature.
How does it compare with T91?
T91 carries roughly twice the allowable stress at 580 °C, so the wall is much thinner. The trade is weldability — T91 needs far tighter procedure control and is much less forgiving on site. Below 580 °C, 2.25Cr usually wins on total cost.
What is the minimum order and lead time?
One tonne per size. Lead time is 30–40 days; heavy wall and TC2 with third-party witness run towards the longer end.
Request a quote
Related products
16Mo3 (1.5415) Tube0.3% Mo, the entry to the creep range
P265GH (1.0425) TubeThe carbon grade below the alloys
ASTM A335 Alloy Boiler PipeP5, P9, P11, P22, P91
ASTM A213 Alloy TubeT5 to T91 boiler and heat exchanger
EN 10216-2 Pressure TubeThe full GH grade range
All boiler and pressure tube — carbon, alloy and stainless · Guide: which standard governs your order
Request a quotation
Give us OD, wall, design temperature, quantity and test category. We reply within 24 hours with price, lead time and certificate scope.