Project Description

Carbon steel butt weld tee to ASME B16.9, equal tee with bevelled ends and heat number marking
NPS 1/2 – 48size range
SCH 10 – XXSwall match
A234 WPBstandard grade
415 – 585 MPatensile range
B16.9dimensional standard
EN 10204 3.1mill certificate
MOQ 100 pieces per size
Lead time 15–25 days
Third party SGS / BV / TUV
Quote within 24 hours
Marking heat number on every fitting
Ordering tees by size and schedule? Send NPS, schedule, quantity and whether the ends are bevelled or plain — the centre-to-end dimension is fixed by B16.9, not by the mill.
Get a quote

A butt weld tee is the fitting that splits or combines a line, and it is the one fitting in a piping spool where the wall thickness and the centre-to-end dimensions both have to be right or the spool will not close. ASME B16.9 fixes the dimensions; ASTM A234 WPB fixes the material. The tee is forged or formed from seamless pipe, the branch is pulled or welded depending on size, and the ends are bevelled to match the pipe wall so the welder has a consistent root gap. We supply equal and reducing tees from NPS 1/2 to 48, in Schedule 10 through XXS, seamless to NPS 24 and welded above, with the heat number, size, schedule and grade stamped on every piece as B16.9 requires.

Equal and reducing: two different fittings

Table 1 — Which tee the line actually needs

Equal tee Reducing tee
Bore Run and branch the same size Branch smaller than the run
Typical use Line splitting to two identical branches, header outlets Branches to instruments, drains, smaller consumers
Dimension to check Centre-to-end C Centre-to-end C on the run, M on the branch
Pressure rating Same as the run pipe Governed by the branch wall; check it against the branch pipe schedule
Stock availability Broad Narrower above NPS 12; expect a longer lead time

Centre-to-end dimensions

These are the B16.9 dimensions, not mill preferences. A tee that measures 3 mm short will pull the spool out of tolerance, and no amount of weld gap will fix it. Check the C dimension on receipt against this table before the fitting goes to fabrication.

Table 2 — ASME B16.9 centre-to-end, equal tee (mm)

NPS C NPS C NPS C
1/2 25 4 105 14 279
3/4 29 5 124 16 305
1 38 6 143 18 343
1 1/4 45 8 178 20 381
1 1/2 51 10 216 24 432
2 64 12 254 26 – 48 per B16.9 table
2 1/2 76 3 1/2 95 — —
3 86 — — — —

For a reducing tee, C is the run centre-to-end and M is the branch centre-to-end; M is smaller than C by 2–3 mm in the small sizes and by more above NPS 12. State both when ordering, because a reducing tee quoted on C alone can arrive with the wrong branch height.

Material: A234 WPB

Table 3 — Chemical requirements, WPB (heat analysis, %)

Element Requirement
Carbon 0.30 max
Manganese 0.29 – 1.06
Phosphorus 0.035 max
Sulphur 0.035 max
Silicon 0.10 min
Chromium 0.40 max
Nickel 0.40 max
Copper 0.40 max
Molybdenum 0.15 max
Vanadium 0.08 max
Cr + Ni + Cu + Mo + V 1.00 max total

Table 4 — Mechanical requirements and heat treatment

Property Requirement Note
Tensile strength 415 – 585 MPa Both a minimum and a maximum; over-strong fittings are rejected
Yield strength, 0.2% 240 MPa min —
Elongation in 50 mm 30% min Longitudinal specimen
Hardness ≤ 187 HBW typical Not a B16.9 requirement but commonly specified for sour service
Heat treatment As formed, or normalized Normalizing required above certain wall and for cold-formed bends
Impact testing Only when specified Charpy at the design temperature, typically −29 °C or −46 °C

Wall schedule and end preparation

Table 5 — Matching the tee to the pipe

Parameter Requirement Practical note
Wall at the ends Matches the pipe schedule within B16.16 tolerance A SCH 40 tee on SCH 80 pipe leaves a step the welder cannot close
Bore Nominal, with machining allowance inside Do not assume the bore equals the pipe ID; check the branch
Bevelling 37.5° ±2.5°, root face 1.6 mm B16.9 ends are bevelled for butt welding as standard
Plain ends Available on request For socket weld or threaded adaptors, specify at order
Length tolerance ±1.5 mm on C B16.9 tolerances; check before fabrication, not after
Alignment Run and branch square within 1° A tee that is out of square twists the whole spool

Seamless or welded

Table 6 — Manufacturing route by size

Size Route Note
NPS 1/2 – 24 Seamless, forged or formed from seamless pipe No longitudinal weld in the fitting body
NPS 26 – 48 Welded, formed from plate or welded pipe Weld seam radiographed per B16.9 when specified
Large bore reducing Welded branch on seamless run The branch weld is the critical inspection point
Any size Machined from bar or forging Small sizes and high-pressure classes; higher cost

Inspection and marking

Table 7 — What is checked and what is stamped

Item Requirement
Chemical analysis Heat analysis on the certificate; product analysis on request
Tensile test One per lot of the same heat and heat treatment
Dimensional C, M, OD, wall, bevel angle, squareness
Visual No laps, seams, cracks or arc strikes
NDE RT or UT on the branch weld when specified; PT on request
Hydrostatic Per B16.9 unless NDE is agreed instead
Marking Manufacturer, grade (WPB), size, schedule, heat number
Certificate EN 10204 3.1 with heat number matching the marking

Where carbon steel tees are used

Plant steam headers

Branch outlets on A106 B headers, SCH 40 to 80, with the branch schedule matched to the consumer line.

Water and utility lines

Cooling water, fire main and compressed air distribution, where A234 WPB is the default fitting grade.

Process piping

Hydrocarbon and chemical lines inside the battery limits, subject to the piping class and the NDE requirement.

Pipeline stations

Manifold and station piping to API 5L pipe, with fittings ordered to A234 WPB and impact tested where the line class requires.

HVAC and chiller

Large-bore chilled water headers, often SCH 20 or SCH 10 welded tees above NPS 26.

Retrofit and repair

Single tees matched to an existing spool, where the C dimension and bevel have to match the pipe on site.

Frequently asked questions

What is the difference between a butt weld tee and a socket weld tee?

The joint. A butt weld tee is bevelled and welded end-to-end to the pipe, giving a full-penetration joint and a fitting that can be radiographed. A socket weld tee has recessed sockets and is fillet welded, used on small bore lines where the joint is not radiographed. They are not interchangeable in a pressure class.

How do I specify a reducing tee?

Give run size × branch size, for example 8 × 4 in SCH 40, plus the schedule of both the run and the branch. B16.9 gives C for the run and M for the branch; if only one size is quoted the fitting may arrive with the wrong branch height.

Can the tee be supplied with a different schedule on the branch?

Yes, within limits. A tee with a SCH 80 run and a SCH 40 branch is made to order; the branch wall must still satisfy the pressure class. State both schedules explicitly rather than assuming the branch follows the run.

What is the maximum size in seamless?

NPS 24 in seamless for standard schedules. Above that the fitting is welded from plate or welded pipe, and the longitudinal seam is radiographed when the purchase order requires it.

Is impact testing available?

Yes, at the temperature stated on the order, usually −29 °C or −46 °C for cold-climate and LTCS service. Impact testing is not a B16.9 requirement for WPB, so it has to be written into the purchase order and it adds about a week to the lead time.

What marking should I expect on the fitting?

Manufacturer’s name or symbol, grade (WPB), size, schedule and heat number, in that order, stamped or stencilled on the body. B16.9 requires it, and a fitting without a heat number cannot be traced back to the certificate.

Can you supply A234 WPB to NACE MR0175?

Yes, with hardness controlled to 22 HRC maximum and the certificate referencing NACE MR0175 / ISO 15156. State the H2S partial pressure and the design temperature, because the standard has a temperature above which the restriction does not apply.

What is the minimum order and lead time?

100 pieces per size for standard schedules in stock sizes. Lead time is 15–25 days; reducing tees above NPS 12 and non-standard schedules run longer. Third-party inspection adds about a week.

Send the line class, not just the size. NPS, run and branch schedule, grade, quantity and whether the ends are bevelled or plain is enough for a firm price with the certificate scope stated.
Request a quote
WhatsApp

Related products

All pipe fittings — butt weld, socket weld and threaded · Guide: B16.9, B16.28 and B16.11 — which standard covers which fitting

Also in this range: stainless steel welding tee · ASTM A335 chrome-moly boiler pipe · ASTM A312 TP304 pipe.

Request a quotation

Give us NPS, run and branch schedule, equal or reducing, grade, end preparation and quantity. We reply within 24 hours with price, lead time and certificate scope.

    Your Name *

    Your Email *

    Company Name

    Phone / WhatsApp *

    Grade & Standard (e.g. ASTM A106 Gr.B, EN 10216-2 P265GH)

    Size, OD × WT (e.g. 88.9 × 5.49 mm)

    Quantity & Unit (e.g. 500 m / 20 t)

    Destination Port

    Drawing or Datasheet (pdf, dwg, step, xlsx; max 5 MB)

    Further Information